How Far Ahead Should We Order Show Shirts or Concert Apparel?

By Brian Bufka, Owner, 1st Place Printing · Printing school-program apparel since 2011 · Updated August 2026

The safest way to plan school-program apparel is to start with the day the shirts need to be in your hands, then work backward.

Printing is only one part of the timeline. Artwork, proof approval, the family ordering window, garment availability, production, sorting and delivery all happen before handout day.

The earlier we know the date, the more options the program keeps.

Step 1: Start With the Need-By Date

Do not start with, “When should we order?” Start with: when do the shirts have to be ready? That might be:

Put the real event date on the calendar. Then set the desired apparel delivery date before that event. The day the bus leaves is not a comfortable delivery deadline.

Step 2: Give the Artwork Room to Get Better

Show shirts and special-event apparel often deserve more thought than a basic school logo shirt. You may need:

Starting early means the program can say, “Let’s improve this,” instead of, “We have to approve something today or we miss the deadline.”

For show shirts especially, the artwork is part of the experience. Give it enough time.

Step 3: Decide When Families Will Order

If the shirts will be sold through an online store, the store needs an ordering window. Families need enough time to:

A clear deadline is important because the main production run begins after the ordering window closes.

For fall marching programs, a summer preorder can work particularly well because the store can be connected to the show reveal and the expense does not have to land during the first chaotic week of school.

Step 4: Production Starts After the Main Order Is Known

Once the order closes, there is still work to do:

Then they have to reach the program. The store deadline is not the same thing as the delivery date. That gap matters.

Step 5: Leave Room for Things You Cannot Control

Starting earlier preserves options when something changes. Possible issues include:

Good planning does not assume something will go wrong. It simply avoids building a plan that requires nothing to go wrong.

Example: Planning Backward From Band Camp

Suppose shirts need to be ready before band camp. Do not simply pick an arbitrary order date. Build backward:

Need-by date: shirts are in the director’s hands.

Before that: delivery and handout buffer.

Before that: printing, checking, sorting and packaging.

Before that: store closes and quantities are finalized.

Before that: families have an ordering window.

Before that: artwork and garment choices are approved.

Before that: initial design discussion.

The exact amount of time in each stage depends on the order, which is why the first useful information you can give us is often just: “We need these by this date.” We can help build backward from there.

A Useful Marching-Band Rhythm

For many fall programs, May or June can be a natural time to begin the show-shirt conversation.

Not every program follows that calendar, but the principle is the same: plan from the event backward instead of from today forward.

What If You Are Already Late?

Contact the printer anyway. Do not spend another two weeks assuming it is impossible.

Rush options depend on:

Sometimes there is a workable solution. Sometimes choices have to be simplified. The earlier we know the real deadline, the more accurately we can tell you what is possible.

Have a Show, Trip or Concert Date?

Tell us the date first. We can work backward with you and determine when artwork, ordering and production need to happen.

Get a quote

FAQ

What if the show artwork is not finished yet?

You can still start the conversation. The need-by date, approximate quantity and type of garments are enough to begin planning.

Can we open the store during the summer?

Yes. Summer ordering can work particularly well for fall programs.

What if a student joins after the main store closes?

Late-order options depend on the store and production schedule. A second window or later production run may be possible.